������������������������ SECTION 07611
����������������� CUSTOM SHEET METAL ROOFING
PART 1� GENERAL
1.1 SECTION INCLUDES
��� A.� Prefinished galvanized steel roofing.
��� B.� Prefinished aluminum roofing.
��� C.� Prefinished, preformed galvanized steel roofing.
��� D.� Integral flashings and counterflashings.
��� E.� Integral fascias.
1.2 RELATED SECTIONS
��� A.� Section 06112 - Framing and Sheathing:� Roof deck construction.
��� B.� Section 06114 - Wood Blocking and Curbing:� Wood blocking and battens for metal roofing substrate profiles.
��� C.� Section 07212 - Board Insulation:� Rigid insulation under sheet metal roofing.
��� D.� Section 07620 - Sheet Metal Flashing and Trim.
��� E.� Section 07631 - Gutters and Downspouts.
��� F.� Section 07724 - Roof Hatches.
��� G.� Section 07810 - Plastic Unit Skylights.
��� H.� Section 07900 - Joint Sealers.
1.3 REFERENCES
��� A.� ASTM A 370 - Standard Test Methods and Definitions for Mechanical Testing of Steel Products.
��� B.� ASTM A 446/A446M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process, Structural (Physical) Quality.
��� C.� ASTM B 209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate.
��� D.� ASTM D 226 - Standard Specification for Asphalt-Saturated� Organic Felt Used in Roofing and Waterproofing.
��� E.� ASTM D 522 - Standard Test Methods for Mandrel Bend Test of Attached Organic Coatings.
��� F.� ASTM D 2244 - Standard Test Method for Calculation of Color Differences from Instrumentally Measured Color Coordinates.
��� G.� ASTM D 4214 - Standard Test Methods for Evaluating Degree of Chalking of Exterior Paint Films.
��� H.� NCCA 11-5 -� Technical Bulletin No. 11-5 of the National Coil Coaters Association.
��� I.� NCCA 11-6 - Technical Bulletin No. 11-6 of the National Coil Coaters Association.
��� J.� NCCA 11-12 - Technical Bulletin No. 11-12 of the National Coil Coaters Association.
��� K.� SMACNA Manual -� Architectural Sheet Metal Manual;� Sheet Metal and Air Conditioning Contractors National Association, Inc.
1.4 SUBMITTALS
��� A.� Submit under provisions of Section 01300.
��� B.� Product Data:� Provide data on properties of metal and finish.
��� C.� Shop Drawings:� Indicate profiles, jointing pattern and details, detailed fastening requirements, flashings, terminations, and details at penetrations and transitions.
��� D.� Selection Samples:� Submit color chips on actual metal samples to illustrate full range of standard colors available.
��� E.� Verification Samples:� Submit two samples not less than 12 inches square, illustrating metal roofing in specified finish, mounted on plywood and including typical fastening detail and typical seam.
1.5 QUALITY ASSURANCE
��� A.� Perform work in accordance with SMACNA standard details and requirements.
��� B.� Fabricator and Installer:� Company specializing in sheet metal roofing installations similar in scope and type to project requirements with not less than 5 years of documented experience.
��� C.� Mock-Up:� Provide mock-up under provisions of Section 01400.
������� 1.� Construct mock-up not less than 6 feet by 6 feet, illustrating typical design features.
������� 2.� Locate where directed by Architect.
������� 3.� Demolish and remove from site when completed roofing work has been accepted.
1.6 DELIVERY, STORAGE, AND HANDLING
��� A.� Deliver, store, protect, and handle products in accordance with provisions of Section 01600.
��� B.� Stack prefinished material to prevent bending, twisting, or mechanical damage, and to allow ventilation.� Cover to protect from ultraviolet light, and slope material to ensure drainage.
1.7 WARRANTY
��� A.� Provide manufacturer's standard twenty year non-prorated warranty against fading, chalking, and loss of film integrity.� Warranty shall include cost of labor and replacement materials through 20th year and shall include the following provisions:
������� 1.� Color change will not exceed 5 NBS color units, when tested in accordance with ASTM D 2244.
������� 2.� Chalking will not be in excess of 8, when tested in accordance with ASTM D 4214.
PART 2� PRODUCTS
2.1 MANUFACTURERS
��� A.� Provide prefinished sheet metal for roofing and roofing accessories as manufactured and distributed by Vincent Metals, Building Products Group, P.O. Box 360, Minneapolis, MN� 55440.� Telephone:� 800-328-7800.
��� B.� Substitutions will not be acceptable.
��� C.� Requests for substitutions will be considered in accordance with provisions of Section 01600.
2.2 MATERIALS
��� A.� Galvanized Steel:� ASTM A 446, Grade A, 24 gage steel, G90 zinc coating, and as follows:
������� 1.� Minimum yield strength:� 36,000 psi, per ASTM A 370.
������� 2.� Coefficient of thermal expansion:� -6.7 x 106 in/in/degree F, per ASTM E 228.
������� 3.� Modulus of elasticity:� 29 x 106, per ASTM E 111.
������� 4.� Coil width:� 36 inches.
������� 5.� Coil width:� 48 inches.
������� 6.� Texture:� Smooth.
������� 7.� Texture:� Embossed stucco.
��� B.� Aluminum Sheet:� ASTM B 209, minimum yield strength 17,000 psi, and as follows:
������� 1.� Thickness:� 0.032 inch.
������� 2.� Thickness:� 0.040 inch.
������� 3.� Thickness:� 0.050 inch.
������� 4.� Thickness:� 0.063 inch.
������� 5.� Sheet width:� 48 inches.
������� 6.� Texture:� Smooth.
������� 7.� Texture:� Embossed stucco.
2.3 ACCESSORIES
��� A.� Concealed Fasteners: As recommended by manufacturer for substrate conditions.
��� B.� Exposed Fasteners:� Rivets color matched to prefinished roofing sheet.
��� C.� Underlayment:� ASTM D 226, No. 15 asphalt saturated roofing felt.
��� D.� Underlayment:� 6 mil polyethylene sheet.
��� E.� Sealant:� As specified in Section 07900.
2.4 PREFORMED ROOFING SYSTEM
��� A.� Provide prefinished ColorKlad System 1 roof system, preformed into standing seam profile and as follows:
������� 1.� Base metal:� 24 gage G90 galvanized steel.
������� 2.� Panel width:� 12 inches.
������� 3.� Panel width:� 16 inches.
������� 4.� Panel width:� 18 inches.
������� 5.� Panel width:� 22 inches.
������� 6.� Panel length:� As indicated on the drawings.
������� 7.� Panel length:� ________________.
��� B.� Accessories:
������� 1.� Double hemmed standing seam snap-on caps in finish matching roof panels.
������� 2.� Clips:� manufacturer's standard 26 gage steel clips, G90 galvanized.
2.5 FABRICATION
��� A.� Perform all cutting and forming operations with hand or power tools to achieve sharp, clean edges, properly dressed and closely aligned.
��� B.� Perform all fabrication with factory-applied strippable film in place.
������� 1.� If soldering is required, carefully remove film and prefinished coating in areas to be soldered, leaving adjacent film and finish undamaged.
��� C.� Form panels and accessories true to shape, accurate in size, and free from distortion.� Form pieces in longest practicable lengths, to avoid seams.
2.6 FINISHES
��� A.� Provide ColorKlad 70% Kynar/Hylar based fluoropolymer coating system on exposed side of roofing panels and accessories, meeting the following requirements:
������� 1.� Thickness: 1 +/- 0.1 mil.
������� 2.� Hardness:� F minimum, per NCCA 11-12.
������� 3.� Adhesion:� 1/16 inch cross hatch; no removal per NCCA 11-5.
������� 4.� Formability:� 180 degree 2T bend with no cracking or removal, per ASTM D 522.
������� 5.� Reverse impact:� Mo removal when taped, impact force of 70 in lbs, per NCCA 11-6.
������� 6.� Color:� As selected by Architect from manufacturer's standards.
������� 7.� Color:� As scheduled on the drawings.
������� 8.� Color:� _________________.
��� B.� Provide protective 0.3 mil wash coat film on reverse side of roofing panels and accessories.
PART 3� EXECUTION
3.1 EXAMINATION
��� A.� Inspect roof deck to verify that it is properly installed and ready to receive sheet metal roofing.� Do not begin roofing installation until unsatisfactory conditions have been corrected.
3.2 INSTALLATION
��� A.� Conform to approved shop drawings and standard SMACNA details for conditions not covered by shop drawings.
��� B.� Install underlayment in 2 layers;� first layer laid parallel to slope and lapped not less than six inches;� second layer laid perpendicular to slope with 2 inch laps.
��� C.� Install roofing system using fasteners at spacing recommended by manufacturer.� Cleat and seam all joints.� Allow for thermal expansion of roofing panels in method of fastening.
��� D.� Immediately after each roofing panel is installed, remove factory-applied protective film.
��� E.� Secure integral flashings with concealed fastening methods;� seal metal joints watertight.� At soldered joints, carefully remove protective film and finish to base metal before soldering, taking care to avoid damage to adjacent finish.
3.3 ADJUSTING AND CLEANING
��� A.� Touch up any areas of abrasion and exposed soldered areas with matching factory-supplied paint.
��� B.� Clean any soiled roofing panels with mild soap and water, followed by a clear rinse.� Do not use abrasives or cleaning techniques that would scratch the prefinished surface.
�
3.4 PROTECTION
��� A.� Do not permit traffic over unprotected roof surface.