������������������������ SECTION 08110
��������������� STANDARD STEEL DOORS AND FRAMES
PART 1� GENERAL
1.1 SECTION INCLUDES
��� A.� Steel doors.
��� B.� Steel frames.
1.2 RELATED SECTIONS
��� A.� Section 08210 - Wood Doors.
��� B.� Section 08220 - Plastic Doors.
��� C.� Section 08710 - Finish Hardware.
��� D.� Section 08800 - Glazing.
��� E.� Section 09900 - Painting.
��� F.� Section 13090 - Radiation Protection.
1.3 REFERENCES
��� A.� ANSI/SDI-100-91 - Recommended Specifications for Standard Steel Doors & Frames;� Steel Door Institute.
��� B.� SDI-105 - Recommended Erection Instructions for Steel frames.
��� C.� SDI-111 - Recommended Standard Details for Steel Doors & Frames.
��� D.� SDI-113 - Test Procedure and Acceptance Criteria for Acoustical Performance for Steel Door and Frame Assemblies.
��� E.� ASTM A 366/A 366M - Standard Specification for Steel, Sheet, Carbon, Cold‑Rolled, Commercial Quality.
��� F.� ASTM A 568/A 568M - Standard Specification for Steel, Sheet, Carbon, and High‑Strength, Low‑Alloy, Hot‑Rolled and Cold‑Rolled, General Requirements For.
��� G.� ASTM A 569/A 569M - Standard Specification for Steel, Carbon (0.15 Maximum, Percent), Hot-Rolled Sheet and Strip Commercial Quality.
��� H.� ASTM A 591/A 591M - Standard Specification for Steel Sheet, Electrolytic Zinc‑Coated, for Light Coating Mass Applications.
��� I.� ASTM A 653/A 653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
��� J.� ASTM A 924/A 924M - Standard Specification for General Requirements for Sheet Steel, Metallic-Coated by the Hot-Dip Process.
��� K.� NFPA 80 - Standard for Fire Doors and Windows.
��� L.� Building Materials Directory; Underwriters Laboratories Inc.
��� M.� Certification Listings;� Warnock Hersey International Inc.
1.4 SUBMITTALS
��� A.� Submit under provisions of Section 01300.
��� B.� Product Data:� Provide manufacturer's standard details and catalog data demonstrating compliance with referenced standards.� Provide installation instructions.
��� C.� Certificates:�
������� 1.� Provide manufacturer's certification that products comply with referenced standards.
������� 2.� Provide evidence of manufacturer's membership in the Steel Door Institute.
��� D.� Shop Drawings:� Submit for approval the following:
������� 1.� Door, frame, and hardware schedule in accordance with SDI-111D.
��� E.� Samples:� Submit for approval the following:
������� 1.� 6 x 6 inch samples of each color of factory finish specified.
1.5 QUALITY ASSURANCE
��� A.� Manufacturer Qualifications:� Provide all products from a single manufacturer who is a member of the Steel Door Institute.
1.6 DELIVERY, STORAGE, AND HANDLING
��� A.� Protect products from moisture, construction traffic, and damage.
������� 1.� Store under cover.�
������� 2.� Place units on 4-inch high wood sills or in a manner that will prevent rust or damage.�
������� 3.� Do not use non-vented plastic or canvas shelters.
������� 4.� Should wrappers become wet, remove immediately.
������� 5.� Provide 1/4-inch space between doors to promote air circulation.
PART 2� PRODUCTS
2.1 MATERIALS
��� A.� Steel Sheet for Doors and Frames:
������� 1.� Cold rolled steel:� ASTM A 366 and A 568.
������� 2.� Hot rolled, pickled, and oiled steel:� ASTM A 569 and A 568.
������� 3.� Hot dipped zinc coated steel: ASTM A 924 and A 653;� Class A40 for alloyed coatings or G60 for spangled coatings, minimum.
��� B.� Steel Sheet for Anchors and Accessories:
������� 1.� Electrolytically deposited zinc coated steel:� ASTM A 591 and A 568;� Class B (0.075 oz/sf), minimum.
2.2 MANUFACTURED UNITS
��� A.� Comply with SDI-100.
��� B.� Fire-rated openings:� Comply with NFPA 80.
������� 1.� Affix permanent labels attesting to fire resistance
������� 2.� At stairway enclosures, provide units listed for 450 degree F maximum temperature rise rating for 30 minutes of exposure.
������� 3.� Provide manufacturer's certificate that oversized openings have been constructed in accordance with all other applicable requirements for labeled door construction.
��� C.� Provide Grade and Model as indicated in the Door Schedule.
��� D.� Provide Grade and Model as follows:
������� 1.� ____:� Grade I, Model 1 (standard-duty, full flush design).
����������� a.� Frames:� 18 gage.
����������� b.� Frames:� 16 gage.
������� 2.� ____:� Grade I, Model 2 (standard-duty, seamless design).
����������� a.� Frames:� 18 gage.
����������� b.� Frames:� 16 gage.
������� 3.� ____:� Grade II, Model 1 (heavy-duty, full flush design).
������� 4.� ____:� Grade II, Model 2 (heavy-duty, seamless design).
������� 5.� ____:� Grade III, Model 1 (extra heavy-duty, full flush design).
����������� a.� Frames:� 16 gage.
����������� b.� Frames:� 14 gage.
������� 6.� ____:� Grade III, Model 1A (extra heavy-duty, full flush design).
����������� a.� Frames:� 14 gage.
����������� b.� Frames:� 12 gage.
������� 7.� ____:� Grade III, Model 2 (extra heavy-duty, seamless design).
������� 8.� ____:� Grade III, Model 2A (extra heavy-duty, seamless design).
����������� a.� Frames:� 14 gage.
����������� b.� Frames:� 12 gage.
������� 9.� ____:� Grade III, Model 3 (extra heavy-duty, stile and rail - flush panel design).
����������� a.� Frames:� 16 gage.
����������� b.� Frames:� 14 gage.
������� 10. Wood or plastic doors specified elsewhere:� Provide 18 gage, Grade I steel frames.
������� 11. Wood or plastic doors specified elsewhere:� Provide 16 gage, Grade I steel frames.
������� 12. Wood or plastic doors specified elsewhere:� Provide Grade II steel frames.
������� 13. Wood or plastic doors specified elsewhere:� Provide 16 gage, Grade III steel frames.
������� 14. Wood or plastic doors specified elsewhere:� Provide 14 gage, Grade III steel frames.
��� E.� Provide units of galvanized steel where indicated on the door schedule.
��� F.� Provide units of galvanized steel in the following locations:
������� 1.� Exterior openings.
������� 2.� Kitchens.
������� 3.� Toilets.
������� 4.� Washrooms.
������� 5.� Locker rooms.
������� 6.� Showers.
������� 7.� Laboratories.
��� G.� Provide glazing stops and beads where glazed lights are indicated.
2.3 DOORS
��� A.� Construct doors in accordance with SDI-100.
��� B.� Exterior doors:
������� 1.� Provide insulated construction with U-value of at least 0.48 when tested in accordance with SDI-113.
������� 2.� Provide manufacturer's standard foam insulated core.
������� 3.� Steel stiffened grid core and stile and rail units are exempt from thermal rating requirements.
��� C.� Construct full flush and seamless door cores as follows:
������� 1.� Fire-rated doors:� In accordance with listed construction.
������� 2.� Honeycomb core.
������� 3.� Polyurethane foam core.
������� 4.� Polystyrene foam core.
������� 5.� Unitized grid core.
������� 6.� Steel stiffeners core.
��� D.� Provide inserted louvers in accordance with SDI-111C where indicated.� Type:
������� 1.� Inverted "V" blade.
������� 2.� "Z" blade.
������� 3.� Inverted "Y" blade.
������� 4.� Light proof.
������� 5.� Adjustable.
������� 6.� Fusible link.
������� 7.� Grille.
2.4 FRAMES
��� A.� Provide either knockdown field assembled or welded unit type frames unless otherwise indicated.
��� B.� Provide welded unit type frames.
��� C.� Provide drywall slip-on type frames for installation after drywall partition are erected
��� D.� Lights and Transoms:� Provide tubular mullions and transom bars with heads and jambs.
��� E.� Terminate stops at a 45 degree angle, 6 inches above floor;� cover stop with welded metal filler plate.
������� 1.� Exception:� Light-proof doors, sound-rated, doors, lead-lined doors, and double egress doors.
2.5 FINISHES
��� A.� Provide factory-finished units.
������� 1.� Color:� As indicated on the color schedule.
������� 2.� Color:� _______.
PART 3� EXECUTION
3.1 EXAMINATION
��� A.� The installer shall verify that project conditions are suitable before beginning installation of frames.
������� 1.� Verify that completed openings to receive knock-down wrap-around frames are of correct size and thickness.
������� 2.� Verify that completed concrete or masonry openings to receive butt type frames are of correct size.
��� B.� Correct unsatisfactory condition before preceding with installation.
3.2 INSTALLATION
��� A.� Install frames in accordance with SDI-105.
��� B.� Install doors plumb and in true alignment and fasten to achieve the maximum operational effectiveness and appearance of the unit.� Maintain clearances specified in SDI-100 or NFPA 80.
��� C.� Fill welded wrap-around frames in masonry construction with mortar as masonry is laid-up.
��� D.� Fill welded wrap-around frames in plaster construction with plaster as work progresses.
��� E.� If additives are used in masonry or plaster work during cold weather, field coat the inside of steel frames with a bituminous compound to prevent corrosion.
3.3 ADJUST AND CLEAN
��� A.� Adjust doors for proper operation, free from binding or other defects.
��� B.� Clean and restore soiled surfaces.� Remove scraps and debris, and leave site and a clean condition.
����������������������� Back to SPECDISK Table of Contents