������������������������ SECTION 14100
������������������������� DUMBWAITERS
PART 1� GENERAL
1.1 SECTION INCLUDES
��� A.� Manual dumbwaiter system, counter loading type, including:
������� 1.� Dumbwaiter machine with roller bearings.
������� 2.� Hand wheel.
������� 3.� Prefinished car and hardware.
������� 4.� Hoist rope and rope guides.
������� 5.� Hand rope.
������� 6.� Counterweights.
������� 7.� Guide rails.
������� 8.� Spring bumpers.
1.2 RELATED SECTIONS
��� A.� Section 04300 - Unit Masonry System:� Hoistway construction.
��� B.� Section 06112 - Wood Framing and Sheathing:� Hoistway construction.
��� C.� Section 06200 - Finish Carpentry:� Hoistway doors and frames.
��� D.� Section 08114 - Custom Steel Doors:� Hoistway doors and frames.
��� E.� Section 08211 - Flush Wood Doors:� Hoistway doors and frames.
��� F.� Section 09260 - Gypsum Board Systems:� Hoistway finish.
1.3 REFERENCES
��� A.� ASME A17.1 - Safety Code for Elevators and Escalators;� The American Society of Mechanical Engineers.
1.4 SYSTEM DESCRIPTION
��� A.� System Characteristics:
������� 1.� Rated net loading capacity:� __________ lbs.
������� 2.� Nominal travel distance:� __________ ft, _______ in.
������� 3.� Number of stops:� __________.
������� 4.� Number of openings:
����������� a.� _______ front.
����������� b.� _______ rear.
����������� c.� _______ side.
������� 5.� Size of openings:� _____ wide x _____ high, located ________ inches above finished floor.
������� 6.� Car size:� ______ wide x ______ deep x _______ high.
��� B.� System Operation:� Provide dumbwaiter operation by means of hand rope, with automatic brake type dumbwaiter machine.�
������� 1.� Brake:� Bronze friction plate disk design, operating on full automatic in both up and down motion of car.
������� 2.� Arrange components so car remains in position under design load when pull on hand rope is released, without use of check or brake line.
1.5 SUBMITTALS
��� A.� Submit under provisions of Section 01300.
��� B.� Product Data:� Include complete information on system design and installation requirements.
��� C.� Shop Drawings:� Include detailed dimensions of all components, including locations of connections to other work;� load reactions at points of support; and arrangement of all equipment.
��� D.� Selection Samples: Include actual pieces of all standard cab finishes, for Architect's selection.
��� E.� Verification Samples:� Selected cab finishes, not less than 6 inches x 6 inches.
1.6 QUALITY ASSURANCE
��� A.� Installer Qualifications:� Company specializing in installing equipment of the type specified, with not less than three years of experience and approved by manufacturer of dumbwaiter system.
1.7 REGULATORY REQUIREMENTS
��� A.� Comply with ________ building code for manufacture and installation of dumbwaiter system.
1.8 WARRANTY
��� A.� Provide manufacturer's six year limited warranty against defective materials.
PART 2� PRODUCTS
2.1 MANUFACTURERS
��� A.� Provide dumbwaiter system as manufactured by Vincent Whitney Company, Inc.; 60 Liberty Ship Way;� P.O. Box 335; Sausalito, CA� 94966.� Telephone:� 800-332-3286 or 415-332-3260.� FAX:� 415-332-0816.
��� B.� Substitutions will not be acceptable.
2.2 DUMBWAITER
��� A.� Provide heavy-duty commercial grade system, model _____, equipped with geared automatic brake.
��� B.� Provide non-geared residential grade system, model _____, equipped with automatic brake.
��� C.� Car:� Fabricate of 3/4 inch plywood with birch veneer, finished with clear lacquer.� Dado, glue, and screw all joints to assure rigid construction.� Include single adjustable shelf.�
��� D.� Car:� Fabricate of mild steel with painted enamel finish.� Weld and bolt components to assure rigid construction.� Include single fixed shelf.�
��� E.� Car:� Fabricate of 304 stainless steel, with Number 4 mill finish.� Weld and bolt components to assure rigid construction.� Include single fixed shelf.�
��� F.� Guide Rails:� Douglas Fir, dense select grade, kiln dried.
��� G.� Counterweights:� Cast iron or steel, adjustable to insure proper operating balance.
��� H.� Hand Rope:� 3/4 inch diameter, soft woven rope joined with swivel coupling.
��� I.� Hoist Rope:� 5/8 inch diameter steel overlaid with hemp (Marlin clad).
��� J.� Hoist Rope:� 3/16 inch steel aircraft cable.
PART 3� EXECUTION
3.1 EXAMINATION
��� A.� Section 01039 - Coordination and Meetings:� Verification of existing conditions before starting work.
��� B.� Verify that finished hoistway is plumb and square and correctly sized.
��� C.� Verify that horizontal guide rail blocking is in correct position, securely fastened, and ready for connection of guide rails.
��� D.� Verify that machine supports of proper size are in position and that openings to hoistway are properly sized and located.
3.2 INSTALLATION
��� A.� Install dumbwaiter in accordance with ASME A17.1.
��� B.� Comply with manufacturer's instructions for assembly and installation of all dumbwaiter components.
3.3 ADJUSTING AND CLEANING
��� A.� Verify that dumbwaiter is properly installed and operating smoothly.� Make any adjustments required to achieve safe and quiet operation.
��� B.� Clean any exposed areas that have become soiled during installation process, using materials and cleaning agents appropriate for substrate.